Equipment Selection for Surface Mining: A Review

2013-7-19  The type of loader selected for use in a surface mine depends on the type of mineral to be extracted and speci cations of the environment, such as the bench height. We must also consider other factors in the equipment selection process, particularly, the compatibility of

Equipment selection QueensMineDesignWiki

2019-6-28  Preliminary Selection Considerations. Equipment selection for a hard-rock mine typically begins with or soon after the planning parameters of the stoping operation is completed; therefore, equipment used for stoping should be suitably sized for the stope dimensions and the characteristics of the orebody. However, it is also impractical to commence mine planning and scheduling without a

Methods for Equipments Selection in Surface Mining;

2011-9-4  1707 The 1 st International Applied Geological Congress, Department of Geology, Islamic Azad University Mashad Branch, Iran, 26-28 April 2010 attribute decision making technique. Fig.1 indicates effective parameters in selection fleet types [2]. Expert System: This is one of the first systems planned for selecting equipments in surface mining in 1987.

Equipment selection for high selective T excavation

2009-8-26  equipment selection is made according to many factors related to the ore and mining conditions. These factors can be qualitative and quantitative in nature. The main purpose of equipment selection is to choose the optimum and cost-effective equipment by installing a decision-support system, which can analyse various and complex factors. The

Mining method selection by multiple criteria decision

2009-8-26  Technical factors such as: mine recovery, flexibility of methods, machinery and mining rate. Productivity factors such as annual productivity, equipment, efficiency and environmental considerations. Each of these criteria can become the principal determining factor in method selection, but the obvious

14 aspects to consider in equipment selection

The design engineer should identify as many aspects that should be evaluated as possible, but only evaluate a dozen or fewer factors in equipment selection. Reviewing the big list frequently while limiting the number of parties involved provides good perspective on overall priorities, and many synergetic criteria are actually met by coincidence.

What are the factors to be considered for selection of

Suitability for Job Conditions: The Equipment must meet the requirement of the work, climate and working conditions. Size of Equipment: Size of equipment should be such that it must be able to be used with other matching units. If the equipment selected is of larger size, that will remain idle for most of the time or shall work on part loads, which means production cost will be more.

Factors influencing mining method selection

2019-6-28  From: Queen's Mine Design Wiki Note: Oil and gas deposits are not discussed here. Underground mining methods are the focus of this article. The selection of a mining method for an ore deposit is based on many factors that are driven by the economics and profitability of the mine

Material Handling Equipment: Selection and

The following factors may be considered while selecting a material handling equipment: (a) Material to be moved: The size of material, its shape, weight, delicacy, nature (solid, liquid, gas) and its chances of getting damaged during handling, etc., should be considered.

Factors Affecting Selection of Construction Equipment

Factors specific to companies: The selection of Construction Equipment also depend on the need of the company. If the company has a lot of projects in hand for the coming few months or even years, then it definitely makes sense for it to invest in the heavy CE.

Equipment selection in mineral processing A

2020-5-1  1. Introduction. Mineral processing equipment selection is the task of examining various machinery alternatives being considered and choosing the most suitable equipment that involves multiple criteria such as technical, environmental, and socio-economic aspects (Sitorus et al., 2019b).The selection of suitable equipment in mineral processing is always of paramount importance.

(PDF) Effective factors investigation in choice between

EFFECTIVE FACTORS IN SELECTING SURFACE OR UNDERGROUND Before beginning a detailed economic analysis of the factors which enter into deciding whether to mine by open-pit or underground mining, and what point a change should be made from open-pit to underground mining, it is necessary to consider some general factors [2].

When to buy or rent heavy equipment five factors to

When to buy or rent heavy equipment five factors to consider. by Ritchie Bros June 05, Fuel is a cost that is common to both owning and renting and needs to be considered for both. selling a massive selection of new and used equipment with no minimum bids or reserve prices.

Mining Underground mining Britannica

Mining Mining Underground mining: When any ore body lies a considerable distance below the surface, the amount of waste that has to be removed in order to uncover the ore through surface mining becomes prohibitive, and underground techniques must be considered. Counting against underground mining are the costs, which, for each ton of material mined, are much higher underground than on the

The Application of Modifying Factors ResearchGate

Modifying Factors, which are considered in sufficient detail to demonstrate at the time of reporting mining rate, mine equipment selection, grade control measures, geotechnical and

1.1 PHASES OF A MINING PROJECT Home ELAW

2019-2-4  begin to plan for the development of the mine. This phase of the mining project has several distinct components. 1.1.2.1 Construction of access roads The construction of access roads, either to provide heavy equipment and supplies to the mine site or to ship out processed metals and ores, can have substantial environmental impacts,

Factors Affecting Selection of Site Building

2021-1-31  Criteria and factors affect site selection for industrial building Environmental consideration is playing the significant role in industrial building construction. The behaviour of the existing buildings or structures neighbourhood may guide in deciding the type and the depth of the foundation of the building to be constructed.

Section 22 Factors to be considered descriptions

2021-1-29  Section 22 of the Impact Assessment Act outlines the factors that must be considered during impact assessments. See below for descriptions of each and links to policy and guidance documents that provide further context. 22 (1) The impact assessment of a designated project, whether it is conducted by the Agency or a review panel, must take into account the following factors:

Five key factors to the correct cable selection and

2021-1-4  5 key factors to the correct cable selection and application (photo credit: testguy.net) The key to the successful operation of a cable system is to select the most suitable cable for the application,make a correct installation, and perform the required maintenance.

10 important factors to consider before starting your

2012-5-3  10 Important Factors to ConsiderBefore Starting Your Own Business“Changing the world one individual at a time.” furniture and office equipment, vehicles etc.• If a business is in the nature of retail you will need to identify the cost of the store and furniture. Amount required for the decoration of the store needs to be assessed.

Equipment selection in mineral processing A

2020-5-1  1. Introduction. Mineral processing equipment selection is the task of examining various machinery alternatives being considered and choosing the most suitable equipment that involves multiple criteria such as technical, environmental, and socio-economic aspects (Sitorus et al., 2019b).The selection of suitable equipment in mineral processing is always of paramount importance.

Sizing equipment for open pit mining a review of

2013-11-29  It identifies the significant variables that need to be considered and suggests an approach to quantify their impact on the mine. The paper also proposes a new view to mine planning and equipment selection with respect to the sensitivity to equipment size factors.

(PDF) Effective factors investigation in choice between

EFFECTIVE FACTORS IN SELECTING SURFACE OR UNDERGROUND Before beginning a detailed economic analysis of the factors which enter into deciding whether to mine by open-pit or underground mining, and what point a change should be made from open-pit to underground mining, it is necessary to consider some general factors [2].

Plant Location: 11 Factors that Influence the Selection

2021-2-1  In fact, several factors/ considerations influence the entrepreneur’s decision in selecting the location for industry. Selection of industrial location is a strategic decision. It is a onetime decision and not be retracted again and again without bearing heavy costs.

APPLICATION guIde bOOk Adobe

2019-9-4  begins with selecting the right equipment to support it. This decision is based on a number of factors, including the material to be mined, the mine plan and the mining application. Each of these factors has an impact on the performance of the fleet that you select. Choosing production equipment

The Application of Modifying Factors ResearchGate

Modifying Factors, which are considered in sufficient detail to demonstrate at the time of reporting mining rate, mine equipment selection, grade control measures, geotechnical and

Loading and Hauling

2016-1-11  5 Factors which need to be considered for any earthmoving job: 9Earthmovinggy p Cycle components 9Job Efficiency Factors 9MtilWiht&S llFtMaterial Weights & Swell Factor 9Vehicle Payloads 9Selection of Equipment. Factor 1 Earthmovinggy p Cycle Components zThe productivity cycle may be separated into six (6) Components: 1. Haul or Push 2. Dump 3

Factors Affecting Selection of Site Building

2021-1-31  Criteria and factors affect site selection for industrial building Environmental consideration is playing the significant role in industrial building construction. The behaviour of the existing buildings or structures neighbourhood may guide in deciding the type and the depth of the foundation of the building to be constructed.

Short-term Underground Mine Planning A Review

2018-9-4  Governmental and environmental and mine closure costs. Two main parameters that classify underground mining methods are: Basic deposit geometry Support requirement necessary to mine stable stop or produce caving and ground problem. Other factors such as environment, health and safety, cost, and output rate could be considered.

Five Factors for Finding the Right Site

Included are the costs of buying or leasing land, office equipment, communications, wages, training, taxes, and IT infrastructure. Expenses are always important — indeed, cost cutting is the default mode for many companies — but in most cases they cannot be the only element driving the decision of where to place new facilities in low-cost